КАРТИНКИ ЗАГРУЖАЮТСЯ...
Квартира (Продажа)
Ссылка:
EDEN-T100138404
/ 100138404
Ссылка:
EDEN-T100138404
Страна:
ME
Город:
Tivat
Категория:
Жилая
Тип сделки:
Продажа
Тип недвижимости:
Квартира
Площадь:
119 м²
Комнат:
4
Спален:
2
Ванных:
2
2 bathrooms
toilet
terrace
living room with kitchen and dining table
All 9 apartments have access to a shared infinity pool.Interior finishing work completed at this stage: installation of communications – water supply and electrical network
windows and doors installed, facade glazing installation process
installation of air preparation system components
plastering and stitching of premise In terms of external work, completed:
roof waterproofing
facade has been prepared for finishing with decorative stone
natural stone is laid on retaining walls
installation of electrical wiring throughout the territory was carried out
The pace of work on site is determined by the dynamics of the customer’s capabilitiesEstimated payment by construction stages:50% at the moment of signing the contract
30% after the completion of external works on the building
20% after completion of internal finishing worksWorks will be finished in 2024. Показать больше Показать меньше Apartment is located in the modern complex of modern architecture, is a novelty on the real estate market in Montenegro. In addition to modern design, the apartments are equipped according to the highest international standards, including a smart home system. The total area ofthe apartment is 119.2 m2, including a terrace of 21 m2 and a storage room of 5 m2. Structure of the apartment: 2 bedrooms
2 bathrooms
toilet
terrace
living room with kitchen and dining table
All 9 apartments have access to a shared infinity pool.Interior finishing work completed at this stage: installation of communications – water supply and electrical network
windows and doors installed, facade glazing installation process
installation of air preparation system components
plastering and stitching of premise In terms of external work, completed:
roof waterproofing
facade has been prepared for finishing with decorative stone
natural stone is laid on retaining walls
installation of electrical wiring throughout the territory was carried out
The pace of work on site is determined by the dynamics of the customer’s capabilitiesEstimated payment by construction stages:50% at the moment of signing the contract
30% after the completion of external works on the building
20% after completion of internal finishing worksWorks will be finished in 2024.